Skip to content

Optimize · Performance Engineering

Performance engineering treated as an operating issue.

Capacity, workload and architecture analysis that connects technical behaviour to business operations.

When to consider it

When Performance Engineering fits

Signals that point here

  • Technical performance is affecting business operations
  • Capacity and workload behaviour need to be understood
  • Integration architecture is creating bottlenecks

The business problem

Performance, resilience and data quality determine whether business-critical SAP can support transformation and growth.

What SMS SAPX does

Scope of work

  • HANA architecture and performance
  • Capacity and workload analysis
  • Bottleneck identification
  • Integration architecture
  • HA/DR and resilience
  • Backup and recovery

How to begin

Start with a focused first step

Start with focused discovery or assessment, establish the business and technical baseline, then define the right delivery model for execution.

  1. Assess
  2. Architect
  3. Mobilize
  4. Execute
  5. Stabilize
  6. Optimize

Entry assessment

Typical duration: 1–2 weeks

HANA Performance Assessment

Identify performance, capacity, resilience and architecture issues.

Discuss your SAP priorities with a senior practitioner.

Start with the problem. We will tell you what we can substantiate and what needs to be assessed.